linkedin

ASHRAE

The American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) is a large technical organization dedicated to building systems, sustainability and energy conservation. The society sponsors research, publications and technical programs to enhance the overall industry. Engineered Air Balance Co., Inc. has been actively involved with ASHRAE committees throughout its history. EAB employees were instrumental in starting the technical committee in ASHRAE for Testing and Balancing, writing ASHRAE Handbook Chapters for Testing and Balancing, serving as an ASHRAE liason to the National Fire Protection Association’s (NFPA) Standard 90A committee (Standard for Installation of Air Conditioning and Ventilating Systems) and updating the UL standard 555 on fire and smoke rated damper testing. EAB employees have also served on the Technical Activities Committee (TAC), Standards Committee and other governing committees within the society.

Engineered Air Balance Co., Inc. employees are currently actively involved in the following society committees:

  1. Technical Committee 5.2: Ductwork
  2. Technical Committee 5.3: Air Distribution
  3. Technical Committee 5.6: Fire and Smoke Control
  4. Technical Committee 7.7: Test and Balance
  5. Technical Committee 7.9: Building Commissioning
  6. Technical Committee 9.6: Healthcare Facilities
  7. Technical Committee 9.10: Laboratories
  8. Standard 79 – Method of Testing: Fan Coil Units
  9. Standard 110 – Method of Testing: Fume Hoods
  10. Standard 111 – Testing and Balancing
  11. Standard 120 - Method of Testing: Flow Resistance of HVAC Air Ducts and Fittings
  12. Standard 126 – Method of Testing: HVAC Air Ducts and Fittings
  13. Standard 130 – Method of Testing: Ducted Terminal Units
  14. Standard 154: Ventilation for Commercial Cooking Operations
  15. Standard 170: Ventilation for Healthcare Facilities
  16. Standard 195: Method of Test: Terminal Unit Airflow Sensors
  17. Standard 200: Method of Test: Chilled Beams
  18. Standard 202: Commissioning Process for Buildings and Systems
  19. Guideline 0: The Commissioning Process
  20. Guideline 1.1: HVAC&R Technical Requirements for the Commissioning Process
  21. Guideline 1.4: Systems Manual for the Commissioning Process
  22. Guideline 11: Field Testing HVAC Control Components
  23. ASHRAE Duct Design Guideline

ashrae