In 2020, Hewlett Packard Enterprise (HPE) broke ground on its new global headquarters in Spring, Texas. The new campus consists of two five-story buildings connected by a bridge corridor at each level totaling 440,000 square feet. HPE purposefully created its new campus with its team and technology in mind. They set out to provide a comfortable, flexible, and state-of-the-art campus where technology is on display for visitors, and their teams feel encouraged to be creative and collaborate.
Engineered Air Balance was proud to be a part of this high-tech project. The general contractor engaged our TAB team for Total System Balance, and our Commissioning team was hired directly by the owner, which often happens on projects. The most significant hurdle to overcome for both teams was the global pandemic. It created new challenges with equipment lead times and personnel productivity due to the constantly evolving situation. To overcome these challenges, the teams relied on constant communication and coordination across all trades to ensure that the schedule and associated activities occurred as effectively as possible.


Brian Elsner, Commissioning Specialist
The EAB Commissioning team evaluated the entire mechanical, electrical, and plumbing scope and ensured, through constant communication, that there were no scope gaps between the integrated systems. Our team delivered the functional performance test scripts early in the project to allow for contractor review and to verify that all parties agreed on the expected operating results. Knowing that long lead times would be costly to the schedule, we set up mock-up systems ready for testing early to functionally test, identify issues, and allow solutions to be obtained earlier in the project.
Our technical knowledge, unmatched thoroughness, constant communication, and proactive problem-solving enabled us to deliver an optimum operating facility for HPE.